Good sound starts weeks before the event – with a handful of concrete details that let the crew choose the system, plan the load-in and avoid improvising on the day. Here is a list worth going through before you send an enquiry.

1. Venue and space

  • Indoor or outdoor – and if outdoor, whether there is a covered stage and a rain-protected position for the front-of-house (FOH) engineer.
  • Stage and audience dimensions – ideally a venue plan or a sketch showing the stage, entrances and audience areas.
  • Rigging options – whether the venue allows loudspeakers to be flown (rigging points, structure, permitted loads) or the system has to be ground-stacked.
  • Acoustics – large, empty, glazed rooms can be very reverberant. Knowing the character of the room helps us place the loudspeakers.

2. Scale and programme

  • Expected attendance – this determines the size and throw of the system.
  • A minute-by-minute running order – performances, speeches, panels, video, breaks.
  • Artists' technical riders – send them as early as possible; they define the console, monitors and microphones.
  • Number of microphones – how many speakers at once, panels, questions from the floor.

3. Power

This is the most frequently overlooked point. A sound system needs a stable, properly protected power supply – ideally separate from lighting and catering. Agree in advance:

  • where the power connection is and how far it is from the stage,
  • what capacity is available and who is responsible for the connection on the venue side,
  • whether a generator is planned for an outdoor event, and who supplies it.

4. Technical schedule

  • Arrival time and vehicle access – unloading close to the stage shortens the load-in.
  • Time for rigging and tuning – the system must be set up and tuned before the artists arrive.
  • Soundcheck – essential for a concert; for a conference, a short microphone check with the speakers.
  • Load-out – when the venue has to be cleared.

5. Communication on the day

A single contact person on the organiser's side who knows the running order and can make decisions saves a great deal of stress. Also agree who passes changes to the engineer – a delay, an extra speaker, a longer encore.

6. Plan B

  • What happens if it rains or the wind picks up at an outdoor event?
  • Are there spare microphones for key speeches?
  • Who decides to stop the event for safety reasons?

The earlier, the better

Booking early does more than secure your date in peak season. It allows a site visit, calm system planning and – with MIRUSSOUND – better pricing. If you plan several events a year, it is worth talking about ongoing cooperation.